• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Chang

    Log entry time 16:10:09 on July20,2000

    Entry number 46537

    keyword=HALOG

    10:08 Mark Jones requested to have a 15 minutes run with beam current
    reduced to about 25 uA for deadtime study. Run 3205 run with 26 uA.
    10:28 Beam restored to 43.6 uA.
    10:53 MCC called informing us there was problem with the injector. Beam
    will be down for a few minutes.
    10:55 Beam is back!

    Run summary:

    Run# Start Stop #Events Comments
    3204/2 8:12 8:34 1.3M
    3205/3 8:35 8:53 1.3M
    3206/4 8:54 9:16 1.3M
    3207/5 9:17 9:40 1.3M
    3208/6 9:41 10:04 1.3M
    3209/1 10:05 10:23 443K Run with 26 uA for deadtime checking
    3210/2 10:28 10:49 1.3M
    3211/3 10:50 11:15 1.3M
    3212/4 11:16 11:38 1.3M
    3213/5 11:39 12:02 1.3M
    3214/6 12:03 12.23 1.3M
    3215/1 12:24 12:47 1.3M
    3216/2 12:48 13:09 1.3M
    3217/3 13:10 13:31 1.3M
    3218/4 13:31 13:52 1.3M
    3219/5 13:53 14:15 1.3M
    3220/6 14:17 14:38 1.3M
    3221/1 14:39 15:02 1.3M
    3222/2 15:03 15:24 1.5M
    3223/3 15:25 15:47 1.5M
    3224/4 15:49 16:08 128K Run with 10.8 uA for deadtime checking