    Log entry time 07:59:43 on July 21, 2000

    Entry number 46617

    keyword=Beam Time Accounting
    Hall A

    7/21/2000 0000-0800
    Experiment #: ndelta
    Shift Leader: E. Brash
    Shift Workers: G. Urcuioli, Lingyan Zhu

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    40 26 42 13 48 46 49 29 4.88333333333333
    Beam Available
    but Not in Use
    0 0 0 0 0 0 0 0 0
    Beam Not Available
    or Unacceptable
    20 34 18 47 12 14 11 31 3.11666666666667
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    60 60 60 60 60 60 60 60 8
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: Continuing thetacm=90degrees production running ... Between 1 and 2 am, there was a cavity in the north linac that gave accelerator some problems, hence the increased downtime. At 7:35, MCC report one of the Hall A IOC's needed to be rebooted, which causes the Moller quads to cycle, which in turn means some down time.

    Data Entry by: E. Brash