    User name Chang

    Log entry time 15:59:23 on July21,2000

    Entry number 46700

    keyword=Run Summary

    08:20 Beam is back; but not centered.
    08:25 Start run 3263.
    08:32 Beam off for a few hours to prepare for the official DOE visit.
    09:10 While taking cosmic data we noticed the CODA deadtime was
    about 18%. We notified Bob Michaels and he will be here in
    about 30 minutes to investigate.
    11:00 DOE visit ended. Mark Jones and Bob Michaels are still in the detector
    hut investigating the high deadtime problem.
    11:40 Problem with high deadtime for cosmic run is caused by not enough
    delay in H-arm pulser. Bob added 48 nsec to H-arm pulser. See
    HALOG entry 46685 for details.
    Runs 3264 through 3296 are runs taken with cosmic (and pulser) while
    investigating the high deadtime problem.
    11:55 MCC called infromed that they still have a few cavities in North Linac
    that are still having problems. Will let us know the status in about
    30 minutes.
    13:00 Beam is back. Started run with 5 uA to test deadtime problem.
    14:32 MCC called to inform us that beam will be off till Hall C finishes
    their harp scan. The reason beam needs to be off is because with
    Hall A running high current and Hall C running low current, the
    integrating BCM would assume there is loss in beam current and
    trips. Beam will be off for about 15 minutes while Hall C is doing
    the harp scan.
    14:48 Full beam intensity restored.
    15:50 At the end of run 3302, we had 9.5 C.


    Run Summary

    Run# Start Stop # of Events Comment
    3263/1 08:25 08:32 313K Beam off to prepare for DOE visit
    3264/2 08:51 08:58 123K Ended because of high high deadtime
    3296/4 11:27
    3297 1300 1317 41 K 5 uA
    3298 1323 1346 132 K 10 uA
    3299 1348 1405 281 K 21 uA
    3300/2 14:08 14:35 929K 47 uA, beam off, Hall C harp scan
    3301/3 14:48 15:21 1.3M
    3302/4 15:22 15:44 1.3M