User name Chang
Log entry time 15:59:23 on July21,2000
Entry number 46700
keyword=Run Summary
08:20 Beam is back; but not centered.
08:25 Start run 3263.
08:32 Beam off for a few hours to prepare for the official DOE visit.
09:10 While taking cosmic data we noticed the CODA deadtime was
about 18%. We notified Bob Michaels and he will be here in
about 30 minutes to investigate.
11:00 DOE visit ended. Mark Jones and Bob Michaels are still in the detector
hut investigating the high deadtime problem.
11:40 Problem with high deadtime for cosmic run is caused by not enough
delay in H-arm pulser. Bob added 48 nsec to H-arm pulser. See
HALOG entry 46685 for details.
Runs 3264 through 3296 are runs taken with cosmic (and pulser) while
investigating the high deadtime problem.
11:55 MCC called infromed that they still have a few cavities in North Linac
that are still having problems. Will let us know the status in about
30 minutes.
13:00 Beam is back. Started run with 5 uA to test deadtime problem.
14:32 MCC called to inform us that beam will be off till Hall C finishes
their harp scan. The reason beam needs to be off is because with
Hall A running high current and Hall C running low current, the
integrating BCM would assume there is loss in beam current and
trips. Beam will be off for about 15 minutes while Hall C is doing
the harp scan.
14:48 Full beam intensity restored.
15:50 At the end of run 3302, we had 9.5 C.
Run Summary
Run# Start Stop # of Events Comment
3263/1 08:25 08:32 313K Beam off to prepare for DOE visit
3264/2 08:51 08:58 123K Ended because of high high deadtime
3296/4 11:27
3297 1300 1317 41 K 5 uA
3298 1323 1346 132 K 10 uA
3299 1348 1405 281 K 21 uA
3300/2 14:08 14:35 929K 47 uA, beam off, Hall C harp scan
3301/3 14:48 15:21 1.3M
3302/4 15:22 15:44 1.3M