User name Adaq
Log entry time 12:49:45 on July31,2000
Entry number 48189
keyword=Compton valve
At approximately 12:25 we experienced a power glitch. At this time (presumably because of this) we had to kcoda and reset ROC 14. This occured at the very end
of run 3998. Also at this time, the control room called to report that valves VBV1P03 and VBV1P04 in the Compton/chicane were constantly opening and closing. About the time Ed Folts was paged, control called back to report that the problem had went away. Ed guessed that the poer glitch may have temporarily affected an ion pump.
B Milbrath