    0800: Run 1117 (cont.)
    0856: Run 1117 stopped. 1.32M events. MCC to work on uncooperative cavity
    0918: Run 1118 started.
    XTerminal HIRESXT21 crashed. Rebooted.
    1018: Run 1118 ended. 1.50M events
    1019: Run 1119 started.
    1045: MCC says they can now try to give us more current. Now have 66 microA.
    Deadtime is 9%.
    1127: Run 1119 ended. 1.50M events. Now moving LH2 out and C in for ARC
    energy measurement.
    1133: Carbon target in place. Control of beam to Arun in MCC.
    1233: Compton electron detector has prevented transmission up until now.
    1422: ARC measurement completed; E = 4606.7 +/- 1.5 MeV
    1425: Starting to retune beam.
    Target did not move. Rebooted target ioc.
    1432: Run 1121 started.
    1511: Run 1121 stopped. 1.15M events
    Wein filter angle from -25 deg to -33 deg. Expected to take ~1/2 hr.
    1533: Run 1122 started.