• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 08:03:39 on November 7, 2000

    Entry number 51651

    keyword=Beam Time Accounting
    Hall A

    11/7/2000 0000-0800
    Experiment #: e99007
    Shift Leader: Higinbotham
    Shift Workers: Kramer, Jones

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    45 48 46 55 46 0 0 25 4.41666666666667
    Beam Available
    but Not in Use
    0 0 0 0 0 0 0 30 0.5
    Beam Not Available
    or Unacceptable
    15 12 14 5 14 1 1 5 3.08333333333333
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 1 1 1 1 1 1 30 7.5
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 300.5
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 30 0.5
    Data Ac 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: During the beam down period from 4:55 to 7:00, we found problems with the FPP portserver and the right HRS. The problem with the HRS turned out to be the high voltages had switched off . Bob is planning to replace the FPP portserver during the machine recovery period today. Data taking was resumed at 07:30. The rest of the shift was quiet.

    Data Entry by: Higinbotham