Main INDEX
Monthly INDEX
PREV
NEXT
User name Higinbotham
Log entry time 08:07:29 on November 8,2000
Entry number 51694
keyword=Shift Summary
00:00 Continue taking data in Q^2=4.0 GeV^2
00:05 Ask MMC to ramp up our beam in approx 30 sec.
instead of 90 sec.
02:00 The faster ramping is working fine and gains us a
few minutes per hour
03:30 The Calorimeter output of the ESPACE kumacs is still
being worked on by Olivier
06:30 Due to the large number of trips/hr we request MCC to lower
our max. current by a few microamps to see if the number
trips will be reduced. We will monitor the effect of the slighly
lower current and see if it improves the amount of charge we
are collecting per hour. (65uA -> 61uA)
06:50 Beam taking away for Quantum Eff. measurement at injector.
06:55 Beam Returned
07:00 Reduced the number of events per file to 1.0 M so that the files
take approx. an hour.
07:10 Called MCC to put our current back to 65uA, but they claimed
that they were having less trips. Will continue to run at the
lower current at least until the 7:45 meeting.
07:20 RF and Vacuum problems, beam will be gone for 10 MCC minutes
08:00 Still no beam (i.e. still counting 10 MCC minutes)
--------------------------------
File Counts Type
1151 0.2 M Elastic
1152 1.5 M Elastic
1153 0.8 M Elastic
1154 Pedestal
1155 1.5 M Elastic
1156 1.5 M Elastic
1157 1.0 M Elastic
1158 0.7 M Elastic
Total 7.2 M