    16:00 Still waiting for beam.
    16:45 MCC has informed us that a water main for one of their dipoles has broken and soaking a power supply in the arc. This means no beam for 4-8 hours.
    20:25 Beam is coming back.
    20:31 Beam back long enough to check raster (run #1183)

    Run #1184-1186 JUNK

    20:58 MCC is having trouble giving 50 uA without trips. Trying 45 uA.

    21:03 Begin run #1187 at ~43 uA
    21:13 End run #1187 (no beam last 2 min) - 94000 events

    Trouble with one cavity tripping.

    21:24 Begin run #1188
    21:53 End run #1188 - 299 K events

    BLM trips. MCC wants to send pulsed beam.

    22:03 Begin run #1189
    22:06 End run #1189 - 24 K events - FPP HV trip

    22:25 Begin run #1190
    23:24 End run #1190 - 600 K events - cavity tuning

    23:27 Begin run #1191
    continuing at end of shift