    User name adaq

    Log entry time 08:13:39 on November 10, 2000

    Entry number 51808

    keyword=Beam Time Accounting
    Hall A

    11/10/2000 0000-0800
    Experiment #: e99007
    Shift Leader: Higinbotham
    Shift Workers: Benmokhtar, Rainer

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    45 50 52 56 55 57 56 57 7.13333333333333
    Beam Available
    but Not in Use
    0 0 0 0 0 0 0 0 0
    Beam Not Available
    or Unacceptable
    15 10 8 4 5 3 4 3 0.866666666666667
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 1 1 1 1 1 1 1 8
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: 00:00 Continue taking data with Q^2=4.0 GeV^2 00:50 No Beam Due To RF Trip 01:05 Quantum Eff. of Cathode Measured 01:10 Beam Back To The Hall 06:00 Started using HANA instead of ESPACE to check PMTs and wire chamber information during active runs. 07:30 Noticed gap in calimeter x vs. y figure to be checked during the day.

    Data Entry by: Higinbotham