• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Fissum

    Log entry time 21:13:30 on November12,2000

    Entry number 51960

    keyword=hall access

    Access the Hall to patch a single calorimeter block energy signal as well as the overall gate signal upstairs to allow a check of the relative timing between the two with the beam on. Our present configuration will last many days, so we want to make sure this timing is exactly what it should be now, and not later.