• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name gilman

    Log entry time 16:02:57 on November13,2000

    Entry number 52017

    keyword=day shift summary Nov 13, 2000


    8:00 smooth shift changeover, but beam is off

    run start time events comments
    1270 8:29 - DAQ has communications problems, but stops
    OK on second end-run attempt - there were
    lots of communication failure to components msgs.
    in CODA, but in components windows they all
    responded ==> some intermittent problem??
    1271 8:35 - coda responds ok as beam coming back
    1272 8:47 1M beam erratic
    1273 9:46 0.37 M end when MCC mentions problem

    10:05 cavity problem, 10-15 minutes to fix... request access to check timing
    ~11:00 done with access

    1274 10:12 43k "cosmic run"
    1275 11:45 7k check raster with 5 uA

    12:00 MCC calls to say there was trip and they are working on getting us beam back.
    We has 5 uA from about 11:45 to 11:52; it tripped when we started going to 45 uA.

    12:15 rad alarm problem, module needs to be replaced, 10 min - 1 hour estimate.

    FPP HV alarmed, channel 8.1.9 was showing 0 V, reset arcnet and turned the
    FPP check script back on.

    1276 12:40 - raster check
    1277 12:43 0.27M data! end for timing change - 32 ns taken out in ch 11
    1278 13:02 1 M - good -
    1279 14:03 1 M - good -
    1280 15:03 1 M - good -
    1281 16:00 started...