001114
16.00 - 24.00 Summary
KF
16.05 MCC called to inform us of hardware problems
in the north linac.
1309.....16.12-17.08.....cosmics
17.05 MCC informed us that they are ready to restore
our beam.
1310.....17.18-18.15.....0.8M.....ended run due to poor beam
17.20 Noticed the Right Arm VDC high voltage is
oscillating between the correct set value of -4.0 kV and
a value of about -1.5kV with a very fast time constant
(about 10 s). I don't think this is real (suspect a
communication fault), but since the Right Arm is not
being used and its magnets are off, I turned the VDC
high voltage off as well, just to be on the safe side. This
should be investigated at the next opportunity.
1311.....18.16-19.14.....1.0M.....macroscopic duty about 65%
1312.....19.15-20.14.....1.0M.....macroscopic duty about 65%
1313.....20.15-21.11.....1.0M.....md ~80%
1314.....21.12-