    User name adaq

    Log entry time 00:09:49 on November 20, 2000

    Entry number 52405

    keyword=Beam Time Accounting
    Hall A

    11/19/2000 1600-2400
    Experiment #: e99007
    Shift Leader: J. Gao
    Shift Workers: C. Perdrisat/M. Jones, H. Ai

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    0.8 0.8 0.83 0.83 0.7 0.87 0.87 0.6 6.3
    Beam Available
    but Not in Use
    0 0 0 0 0 0 0 0 0
    Beam Not Available
    or Unacceptable
    0.2 0.2 0.17 0.17 0.3 0.13 0.13 0.4 1.7
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 8
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0.8 0.8 0.83 0.83 0.7 0.87 0.87 0.6 6.3
    Other 0 0 0 0 0 0 0 0 0

    Comments: 16:39 FPP rear chamber HV tripped, run 1431 was stopped . 16:46 run 1432 started after FPP rear chamber HV was recovered.

    Data Entry by: J. Gao