    keyword=Shift Summary.


    Shift Summary:
    ************

    16:00...Can't move to Carbon Target, We reboted, start the gui, nothing happens.
    ............Asked for access to the hall to power cycle the control, Joe will do it.
    16:38... Moved to Carbon Target.
    16:52... Asked for 5 uA, raster off for ep measurments.
    17:55... Moved to Hydrogen Target., running with 48 uA.
    18:45... According to Joe, e-p Energy Measurments gives: 4.6067 (0.6) GeV.
    23:53... Mcc Called, a lot of trips, Beam will not be usefule for the next 30 min.
    ............ They said that same thing happened yesterday (night shift).

    Run Summary:
    ************

    Run#.....Start.....End.....#Events......Comments

    1477.....18:05.....19:00.......1M........Good run
    1478.....19:00.....19:53.......1M........Good run
    1479.....19:53.....20:50.......1M........Good run
    1480.....20:50.....21:49.......1M........Good run
    1481.....21:50.....22:51.......1M........Good run
    1482.....22:52.....23:53.......0.88M...Stopped , beam trips.