User name T. Chang
Log entry time 08:00:13 on December 4,2000
Entry number 52860
keyword=shift summary
00:14 Run 1608 finished. 1M trigger taken. Everything seems quiet and smooth so far...
00:15 Run 1609 started. 1M trigger taken. Run ends 01:03.
01:04 Run 1610 started. Hall_C is down for a while. we called MCC to increase the current to 75 uA. 1M trigger taken. Run ended 01:49.
During last run the FSD triped often. We wonder if this is related to the high current we requested. Call MCC to reduce the current to 70 uA.
01:50 Run 1611 started. FPP trips. Ended run at 2:00. 0.16M trigger taken.
02:11 Run 1612 started. FPP trips again. run ended at 2:35. 0.73M triggers taken.
We request the beam current to be 65 uA. Hope this can bring us more steady beam and less FPP trips.
02:43 Run 1613 started. 02:50 Hall-C is back on. Beam back to 50 uA. Run ended at 03:05, deceived by a false alarm from FPP. 0.42M triggers taken.
03:07 Run 1614 started. 1M triggers taken. Run ends at 04:03.
04:04 Run 1615 started. 04:42 FPP 8.1.22 trips again. end run. 0.71M triggers taken.
04:46 Run 1616 started. 1M triggers taken. Run ends at 05:38.
05:39 Run 1617 started. 06:26 FPP 8.1.22 trips again. end run. 0.75M triggers taken.
06:30 Run 1618 started. end run at 06:40 due to QE measurement. 0.21M triggers taken.
Accelerator will be down about 15 min for QE measurement.
06:52 Run 1619 started. 1M triggers taken. run ends at 07:52.
07:53 Run 1620 started. will end on next shift.
Shift summary:
* changed loop_check_fpp.tcl rate/current alarm setting from 100 to 90.
* FPP channel 8.1.22 trips several times.
* Argon pressure keep dropping due to leakage in the gas line.
* Total triggers taken in this shift: 9.02M triggers.