User name Egle
Log entry time 00:01:49 on December17,2000
Entry number 53697
keyword=Shift summary 12/16 4-12 pm
Shift 4-12 pm on 12/16
Run # Start/Stop # Events
1937 15:57/16:34 1M
current increased to 65 muA
1938 16:46/17:25 750 K
The beam is unstable, so we go back to 60 muA during run 1938.
Run stopped because fpp channel 7.1.16 off.
Replay: spec_H.react_z still peak at channel zero.
1939 17:26/17:43 252k
run stopped because of alarm FPP.
1940 17:44/18:41 1 M no interruption
1941 18:42/19:31 1 M
1942 19:33/20:26 1 M
1943 20.26/21:15 1 M
01944 21:18/22:11 800 k
22:25: stop run because the beam is off
1945 22:38/23.30 1 M
1946 22:30
Some beam instability. Otherwise no major problems.
Hall C wants to change the half wave plate position, but Hall B asked to delay.