    Shift 4-12 pm on 12/16

    Run # Start/Stop # Events

    1937 15:57/16:34 1M
    current increased to 65 muA
    1938 16:46/17:25 750 K
    The beam is unstable, so we go back to 60 muA during run 1938.
    Run stopped because fpp channel 7.1.16 off.
    Replay: spec_H.react_z still peak at channel zero.
    1939 17:26/17:43 252k
    run stopped because of alarm FPP.
    1940 17:44/18:41 1 M no interruption
    1941 18:42/19:31 1 M
    1942 19:33/20:26 1 M
    1943 20.26/21:15 1 M
    01944 21:18/22:11 800 k
    22:25: stop run because the beam is off
    1945 22:38/23.30 1 M
    1946 22:30

    Some beam instability. Otherwise no major problems.