• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name LeRose

    Log entry time 00:00:40 on December19,2000

    Entry number 53829

    keyword=Shift Summary

    Shift starts with Moller measurement
    Moller completed at 17:25 see Halog 53809 (Pz=71.7+-0.15(stat)+-2.4(sys)%)
    19:30 MCC (April) says they're having laser instability problems estimate 15min to 1 hour down....She calls back 5 minutes later saying the problem is solved!
    21:47 half wave plate inserted
    22:49 Front FPP trip (ended run 1998)
    23:38 Front FPP trip (ended run 1999)


    run #.......start/stop........events........comments
    1991.....17:41/18:30.........1.0M........good run
    1992.....18:31/19:21.........1.0M........good run
    1993.....19:22/19:34........0.096K......stopped early MCC claimed laser problems
    1994.....19:35/20:42.........1.0M.........good run
    1995.....20:42/21:32.........1.0M.........good run
    1996.....21:33/21:47.........0.273M.....ended for half wave plate insertion
    1997.....21:48/22:40.........1.0M.........good run
    1998.....22:41/22:49.........0.14M........stopped for fpp trip
    1999.....22:50/23:28.........0.8M..........another FPP trip
    2000.....23:31/ passed to the owl shift


    Total 6.31M events