Main INDEX
Monthly INDEX
PREV
NEXT
User name LeRose
Log entry time 00:00:40 on December19,2000
Entry number 53829
keyword=Shift Summary
Shift starts with Moller measurement
Moller completed at 17:25 see Halog 53809 (Pz=71.7+-0.15(stat)+-2.4(sys)%)
19:30 MCC (April) says they're having laser instability problems estimate 15min to 1 hour down....She calls back 5 minutes later saying the problem is solved!
21:47 half wave plate inserted
22:49 Front FPP trip (ended run 1998)
23:38 Front FPP trip (ended run 1999)
run #.......start/stop........events........comments
1991.....17:41/18:30.........1.0M........good run
1992.....18:31/19:21.........1.0M........good run
1993.....19:22/19:34........0.096K......stopped early MCC claimed laser problems
1994.....19:35/20:42.........1.0M.........good run
1995.....20:42/21:32.........1.0M.........good run
1996.....21:33/21:47.........0.273M.....ended for half wave plate insertion
1997.....21:48/22:40.........1.0M.........good run
1998.....22:41/22:49.........0.14M........stopped for fpp trip
1999.....22:50/23:28.........0.8M..........another FPP trip
2000.....23:31/ passed to the owl shift
Total 6.31M events