• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name R. Michaels

    Log entry time 18:09:12 on January 3,2001

    Entry number 53924

    keyword=more modifications

    The following modifications were made:
    1. Added a 32-channel scaler to R-arm as first scaler,
    the header is ceb0. Into this goes the Left and Right PMTs
    from scintillators.
    2. Swapped the power supply for hatsv3 (R-arm) and plugged
    in the bottom HV crate, it is on port 5. The info in ~adaq/doc/portserver.doc
    was updated.
    ------
    Status: Trigger works on both arms, DAQ on L-arm only ("lspect" config).
    After L-arm detector stack goes in it takes about 8 hours to restore full setup,
    however I am missing cables from L-arm to BPM crate (Jack knows).