User name R. Michaels
Log entry time 18:09:12 on January 3,2001
Entry number 53924
keyword=more modifications
The following modifications were made:
1. Added a 32-channel scaler to R-arm as first scaler,
the header is ceb0. Into this goes the Left and Right PMTs
from scintillators.
2. Swapped the power supply for hatsv3 (R-arm) and plugged
in the bottom HV crate, it is on port 5. The info in ~adaq/doc/portserver.doc
was updated.
------
Status: Trigger works on both arms, DAQ on L-arm only ("lspect" config).
After L-arm detector stack goes in it takes about 8 hours to restore full setup,
however I am missing cables from L-arm to BPM crate (Jack knows).