• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name johna

    Log entry time 22:49:57 on January 9,2001

    Entry number 54169

    Followups:

    keyword=HRS-left Preshower HV changes.

    Made a preliminary adjustment of the PS HV based on cosmics. We were getting
    peaks at about 200 channels for ~60 MeV deposited by cosmic rays. We want this
    to be closer to 1 channel/MeV, but in order to keep the voltages from getting too low
    (and because I only have an approximate delta_gain/delta_voltage), I've aimed for 90 channels. The following are the channel number (according to the espace histograms), the HV location (slot:channel), the old HV settings, and the new HV settings. The changes were made just before run 1128.

    PS_num HV_loc HVold HVnew
    ------------------------------
    4 4:00 1130 1013
    5 4:01 1255 1139
    6 4:02 1195 1078
    10 4:03 1175 1080
    11 4:04 1200 1136
    12 4:05 1175 1054
    16 4:06 1190 1078
    17 4:07 1280 1152
    18 4:08 1100 969
    22 4:09 1160 1032
    23 4:10 1210 1069
    24 4:11 1025 1070
    28 5:00 1100 956
    29 5:01 1200 1040
    30 5:02 1115 1026
    34 5:03 1110 1019
    35 5:04 1275 1169
    36 5:05 1185 1098
    40 5:06 1165 1107
    41 5:07 1165 1033
    42 5:08 1175 1067
    46 5:09 1165 1025
    47 5:10 1200 1049
    48 5:11 1080 945
    1 7:00 960 822
    2 7:01 1180 1050
    3 7:02 1075 957
    7 7:03 1150 996
    8 7:04 1140 1015
    9 7:05 1105 1012
    13 7:06 1275 1168
    14 7:07 1175 1063
    15 7:08 1100 996
    19 7:09 1175 1032
    20 7:10 1110 973
    21 7:11 1210 1077
    25 8:00 1160 1055
    26 8:01 1180 1059
    27 8:02 1145 1017
    31 8:03 1180 1080
    32 8:04 1180 1078
    33 8:05 1095 982
    37 8:06 1200 1120
    38 8:07 1165 1112
    39 8:08 1205 1118
    43 8:09 1160 1037
    44 8:10 1155 1027
    45 8:11 1050 937