0800 | 0900 | 1000 | 1100 | 1200 | 1300 | 1400 | 1500 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 25 | 0 | 0 | 0 | 0 | 3 | 45 | 50 | 2.05 |
Beam Available but Not in Use | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 10 | 0.166666666666667 |
Beam Not Available or Unacceptable | 35 | 1 | 1 | 1 | 1 | 57 | 15 | 0 | 5.78333333333333 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 50 | 7.83333333333333 |
Planned Config- uration Change | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 10 | 0.166666666666667 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSe | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSh | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Data Ac | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Comments: 1st run 1191 (12C optics) Accelerator takes beam at 8:30 for what they say will be 2 hours Spectrometers moved to 41.45 degrees and Bogdan and Joerg go into the Hall to work on detectors in the interim 11:50 MCC says the problem has been identified, 1 hour to repair. Bogdan is still in the Hall. Ron Gilman takes over as shift leader at noon.
Data Entry by: J. LeRose