    User name adaq

    Log entry time 16:47:22 on January 11, 2001

    Entry number 54346

    keyword=Beam Time Accounting
    Hall A

    1/11/2001 0800-1600
    Experiment #: e94104
    Shift Leader: John LeRose/R. Gilman
    Shift Workers: Feng Xiong, John Calarco

    08000900100011001200130014001500Total Time
    Acceptable Beam
    in Use
    25 0 0 0 0 3 45 50 2.05
    Beam Available
    but Not in Use
    0 0 0 0 0 0 0 10 0.166666666666667
    Beam Not Available
    or Unacceptable
    35 1 1 1 1 57 15 0 5.78333333333333
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 1 1 1 1 1 1 50 7.83333333333333
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 10 0.166666666666667
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: 1st run 1191 (12C optics) Accelerator takes beam at 8:30 for what they say will be 2 hours Spectrometers moved to 41.45 degrees and Bogdan and Joerg go into the Hall to work on detectors in the interim 11:50 MCC says the problem has been identified, 1 hour to repair. Bogdan is still in the Hall. Ron Gilman takes over as shift leader at noon.

    Data Entry by: J. LeRose