• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name LeRose

    Log entry time 13:18:48 on January18,2001

    Entry number 55006

    keyword=Raster Problem

    Upon returning to production beam conditions found that the raster was not the same as before our attempt at beam energy measurement. Spot++ shows the beam collapsed vertically from 5mm to about 2. MCC is trying a reboot of the IOC that controls the raster. If that doesn't work they'll call in an expert.