Main INDEX
Monthly INDEX
PREV
NEXT
User name LeRose
Log entry time 13:18:48 on January18,2001
Entry number 55006
keyword=Raster Problem
Upon returning to production beam conditions found that the raster was not the same as before our attempt at beam energy measurement. Spot++ shows the beam collapsed vertically from 5mm to about 2. MCC is trying a reboot of the IOC that controls the raster. If that doesn't work they'll call in an expert.