Main INDEX
Monthly INDEX
PREV
NEXT
User name Feng
Log entry time 16:24:25 on January21,2001
Entry number 55361
keyword=Shift summary
09:00 We asked for controlled access to change the beamline HV crate. After
that the EPICS HV control works fine. More details please see entry #55358.
10:15 MCC called to say that it might take them 4 to 8 hours to get vacuum back,
and hopefully get beam back at midnight.
13:30 Changed the spectrometer polarity. The spectrometer momentum was set
to -3.863 GeV/c for left arm, and 2.442 GeV/c for right arm. The quads
were cycled on right arm, but not on left arm, because the currents were
already above 1600 A.
16:00 Set the spectrometer angles to be 36.47 degree for right arm and 22.05
degree for left arm.