• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name bogdanw

    Log entry time 20:52:38 on January21,2001

    Entry number 55369

    keyword=S1/S2 PMT checkout

    The checkout of after pulse probability was made.

    The results below indicate that six PMTs have such probability above 5%.

    Jack and I replaced three tubes on Left Arm on the
    positions S2/1right, S2/2right, and S2/4right.

    The initial HVs are installed -2250 V.
    It most likely should be reduced later based on ADC results.

    the Right Arm
    ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
    #PMT % of after pulse #PMT
    S1/1 left 4.0 S1/1 right 3.4
    S1/2 1.0 1.1
    S1/3 2.8 S1/3 right 1.0
    S1/4 0.7 0.9
    S1/5 0.6 1.0
    S1/6 1.4 S1/6 right 1.1

    S2/1 2.9 S2/1 right 7.2
    S2/2 1.3 S2/2 right 6.4
    S2/3 1.1 0.6
    S2/4 1.7 4.8
    S2/5 0.9 1.5
    S2/6 7.5 1.3
    ----------------------------------

    the Left Arm
    ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
    #PMT % of after pulse #PMT
    S1/1 left 1.2 S1/1 right 0.7
    S1/2 1.3 1.8
    S1/3 0.6 S1/3 right 2.6
    S1/4 2.7 2.5
    S1/5 1.3 2.5
    S1/6 2.2 S1/6 right 2.7

    S2/1 4.2 S2/1 right 11.5
    S2/2 3.7 S2/2 right 8.6
    S2/3 1.9 3.2
    S2/4 2.7 7.4
    S2/5 2.5 2.3
    S2/6 3.2 3.8
    -----------------------------------


    FIGURE 1