• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name S. Sirca

    Log entry time 23:56:59 on January24,2001

    Entry number 55616

    keyword=Evening shift summary

    Much of the shift was spent on waiting for the spectrometer magnets to settle.
    Switched to coincidence kinematics #17 (see entry

    55611
    for details). Also, the HARP scans were done (see entry

    55607
    ) and the ep beam energy measurement (see entry

    55615
    ).


    Run sumary (runs prior to these back to run #1683 are junk):


    Run# Start/Stop Events Comments
    1688 22:21/22:31 0.00 M HARP scan
    1689 junk
    1690 23:05/23:22 0.35 M LD2, 6% radiator IN, checkout run
    1691 23:22/-----> passed on to the night shift