• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Saha

    Log entry time 16:05:43 on January26,2001

    Entry number 55791

    keyword=Shift Summary

    Shift Summary
    ____________

    0800: Run 1750 continuing (Kin 2)
    0915: Run 1750 ended. 368k events
    MCC takes away beam for injector studies (~15 mins)
    0935: Run 1751 started.
    1042: Shift checklist completed (R. Gilman)
    1100: Run 1751 ended. 269k events
    MCC takes away beam to recalibrate the MPS BCM system(~1 hr)
    Changing to BeO target tro check beam spot position
    13:45 Beam back, looked ok on BeO (raster was still on though).
    Asked MCC to let us move to LH2 target. They will call us back.
    13:50 MCC called - we can move the target.
    14:00 Target moved
    Run 1752 started.
    1513 Run 1752 ended, 500k events
    1517 Run 1753 started
    1600 Run 1753 continuing (~275k)