4:00: B Shift starts.
Crew: G. M. Urciuoli SL
Marius Coman TO
Brian Braue 3rd
Laird Kramer Replay
Time Run Target N. of Events Prescalers Comments
15:28 1774 LH2 0.482 M 1/7500/10/7500/1 Stopped (see
below).
16:34 An alarm apparently about VDC connection appears. After some investigation the alarm seems to be presumibly false. After a pause caused by lack of beam the data taking restarts.
17:36 Run 1775 junk.
It was discovered that the reason of the alarm was the left arm HV crate failure.
DAQ stopped
18:40 Run 1776 Cpsmic Rays Run , prescalers = 1/7500/1/7500/1.
19:45 Left arm HV crate replaced.
Run 1777-1781: Junk
20:49 Run 1782 Cosmic Rays, prescalers = 1/7500/1/7500/1.
21:00: the power supply in the left arm HV crate that still had problems
was recovered.
Time Run Target N. of Events Presacalers Comment
21:14 1783 Junk
other problems appeared: Roc2 had to be rebooted (another access requested to fix
this problem), thresholds of VDC apparently zeroed. Thresholds are not jet fixed at the end of this shift.