shift starts with run 1858 in progress (kinematics 7)
run start/stop # events
1858......0736/0852....0.75M
1859......0852/0908....0.09M left HV trip ends run
1860.....0910/ 0932...0.24M
Dummy Target
1861....0939/0945.....0.5M
BeO target
0945 doing BeO test: 3mm up and 2mm left. (stable)
Optics target
1862 Junk
1863....0959/1007.....0.59M
1010-1040 Access for angle change
change to kinematics 9: Left arm 12.55 and 1.89 GeV/c
1864...1049/1054 .......0.75M optics
1865...1054/1057........0.27M optics reduced to 10 microamps
changed to 15 cm dummy
1866....1100/1103......0.75M 15cm dummy
changed ps3 to 20
1867....1103/1108......0.7M
changed to H2 target (reset prescales)
1868...1114/1124.......0.075M low current with fastfeedback off
1869...1126/1139.......0.75M
1870...1140/1151.......0.75M
1871...1151/1207.......0.75M
1872...1207/1224.......0.75M
1873...1224/1237.......0.75M
1874...1237/1248.......0.75M
1875...1249/1259.......0.75M
1876...1300/1318.......0.75M
1877...1318/1329.......0.75M
14 minutes for change to Kinematics 8 (Left Arm to 27.849 degrees po=1.89 GeV/c)
1878....1343/1511.....0.75M
changed left VDC discriminator levels from 4.0 to 3.5
1879....1512/...........passed on to swing shift