Main INDEX
Monthly INDEX
PREV
NEXT
User name Olivier
Log entry time 16:03:09 on February18,2001
Entry number 56345
keyword=Day shift summary
8:00 Take over from owl shift
8:02 1937 Optics run on 9 foils
8:30 Move to LD2 target, rad OUT, raster ON. Raster is down, MCC needs time to fix it.
8:50 1938 Spot check. Raster too small, position off.
Trouble getting beam in the hall, trouble getting position right
and trouble getting the raster
9:50 1939 Finally accept raster 2*1.5
10:04 Position finally locked at (0;0) - Start prod run 1940
10:25 Stop 1940 for CODA problems - Start 1941
10:33 Stop 1941 - Start 1942
10:45 Stop 1942 - Move Rad IN
10:48 Problem with beam dump - MCC estimates ~1h. Controled access
12:30 Vacuum problem in beam dump fixed. Back to peam permit.
12:42 Start 1943 - 10 uA
12:57 Stop 1943 - Start 1944
13:15 Stop 1944 - Start 1945
13:27 Stop 1945 - Change prescale factors 1 and 3 to 5, move to 20 uA
13:31 Start 1946
13:40 Stop 1946 - RF cavity down - Expected 15 min. Move to BeO target.
14:24 Move to LH2 target
14:35 Start 1947 - 30 uA
15:00 Stop 1947 - Move Rad OUT
15:05 Start 1948 - 30 uA
15:25 Stop 1948 - Move to LD2 target, rad IN
15:33 Start 1949 - 20 uA
15:49 Stop 1949 - Start 1950
16:00 Stop 1950 - Completed kinematics #9
Run summary
************
Run Target Rad Counts
----------------------
1937 9-foils - 750 k
1940 LD2 OUT 500 k
1941 LD2 OUT 758 k
1942 LD2 OUT 752 k
1943 LD2 IN 758 k
1944 LD2 IN 2 M
1945 LD2 IN 1.2 M
1946 LD2 IN 380 k
1947 LH2 IN 777 k
1948 LH2 OUT 328 k
1949 LD2 IN 1 M
1950 LD2 IN 710 k