    User name Olivier

    Log entry time 16:03:09 on February18,2001

    Entry number 56345

    keyword=Day shift summary

    8:00 Take over from owl shift
    8:02 1937 Optics run on 9 foils
    8:30 Move to LD2 target, rad OUT, raster ON. Raster is down, MCC needs time to fix it.
    8:50 1938 Spot check. Raster too small, position off.
    Trouble getting beam in the hall, trouble getting position right
    and trouble getting the raster
    9:50 1939 Finally accept raster 2*1.5
    10:04 Position finally locked at (0;0) - Start prod run 1940
    10:25 Stop 1940 for CODA problems - Start 1941
    10:33 Stop 1941 - Start 1942
    10:45 Stop 1942 - Move Rad IN
    10:48 Problem with beam dump - MCC estimates ~1h. Controled access
    12:30 Vacuum problem in beam dump fixed. Back to peam permit.
    12:42 Start 1943 - 10 uA
    12:57 Stop 1943 - Start 1944
    13:15 Stop 1944 - Start 1945
    13:27 Stop 1945 - Change prescale factors 1 and 3 to 5, move to 20 uA
    13:31 Start 1946
    13:40 Stop 1946 - RF cavity down - Expected 15 min. Move to BeO target.
    14:24 Move to LH2 target
    14:35 Start 1947 - 30 uA
    15:00 Stop 1947 - Move Rad OUT
    15:05 Start 1948 - 30 uA
    15:25 Stop 1948 - Move to LD2 target, rad IN
    15:33 Start 1949 - 20 uA
    15:49 Stop 1949 - Start 1950
    16:00 Stop 1950 - Completed kinematics #9







    Run summary
    ************

    Run Target Rad Counts
    ----------------------

    1937 9-foils - 750 k
    1940 LD2 OUT 500 k
    1941 LD2 OUT 758 k
    1942 LD2 OUT 752 k
    1943 LD2 IN 758 k
    1944 LD2 IN 2 M
    1945 LD2 IN 1.2 M
    1946 LD2 IN 380 k
    1947 LH2 IN 777 k
    1948 LH2 OUT 328 k
    1949 LD2 IN 1 M
    1950 LD2 IN 710 k