    keyword=Schift summjary

    Shift summary

    08:00 : still no beam
    11:30 : lost phone connection (for about 15 min)
    12:30 : MCC announced physics beam delivery
    13:30 : MCC called, accelerator magnet problem (Magnet Overtemperature fault, "something is clogging the line"), need to make access to accelerator, no beam expected for some hours.
    16:00 : MCC cleared the one magnet with clogging. Will flush all the other
    magnets. Expect beam in two hours (MCC time).