    User name Adaq

    Log entry time 16:01:44 on February21,2001

    Entry number 56664

    keyword=Day shift summary

    At the start of the shift waited for completion of kinematic change to
    singles 9. Noticed the Right Dipole didn't lock at set value.
    At 8:300 came the news that beam will be unavalaible for at least 4 hours
    due to accelerator work for Hall C.

    The problem with the Dipole turned out to be serious. The power supply
    controller was locked. Aksed for acces to the hall.
    Marc Stevens started working on the problem.
    After gaining manual controll of the power supply, the dipole had to be
    ramped down.
    13:00 field zero. Access to reload controller software
    14:00 asked for sweep and closing of the hall
    15:00 Hall is in beam permit magnet is ready.

    checked BeO target; spot ok up 0.4 and left 0.1 mm
    Finally we started at
    1545 Run 2079