    0:19 Kinematic setting singles 8 was finished lasr run 2108

    New setting 50 deg cm

    1:00 2111 start production on D2 with radiator in 1M events
    1:13 2112 1 M events
    1:24 2113 1 M events
    1:39 2114 1 M events
    1:52 2115 1 M events

    2:03 2116 1 M events radiator out
    2:19 2117 1 M events

    Change to H2 target

    2:52 2119 1 M events radiator out
    3:12 2120 1 M events radiator in
    3:26 2121 1 M events

    Change to dummy target

    3:47 2122 500k events radiator in
    4:01 2123 350k events radiator out

    concludes thes kinematic setting

    made short test of pion rejection in left arm Q2 set to zero
    run 2114

    4:40 called for controlled access of hall to start changing to He target