User name Calarco
Log entry time 15:05:50 on February24,2001
Entry number 56922
keyword=Shift summary
The shift started as the right arm dipole was being restarted after a fuse was blown
in the supply. By 10:15, the dipole had reached its set momentum of -2.929 GeV/c.
After checking beam quality, We did run 2179 on 4He with 6% radiator for 0.5 hr.
We had just started run 2180 on 4He with 0% radiator when the power failure
occured at approximately 11:10. The remainder of the shift was spent in recovery
from the power failure.