    User name Calarco

    Log entry time 15:05:50 on February24,2001

    Entry number 56922

    keyword=Shift summary

    The shift started as the right arm dipole was being restarted after a fuse was blown
    in the supply. By 10:15, the dipole had reached its set momentum of -2.929 GeV/c.
    After checking beam quality, We did run 2179 on 4He with 6% radiator for 0.5 hr.
    We had just started run 2180 on 4He with 0% radiator when the power failure
    occured at approximately 11:10. The remainder of the shift was spent in recovery
    from the power failure.