• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name jpchen/mccormick

    Log entry time 16:11:01 on February27,2001

    Entry number 57092

    keyword=Target motion during warm-up and cooldown.

    Target motion during warm-up (to 120K)
    of He4 target and cool-down of LH2/LD2 targets:
    Total motion is: horizontal target moved towards beamleft 0.5mm+-0.5 mm,
    along beam direction moved upstream 2.5 mm+- 0.5 mm. Vertical 0mm+-0.5mm.
    Only He4 warmup motion: horizontal motion to beam left 0.5 mm+-0.5 mm,
    vertical 0+-0.5mm, along beam 0+-0.5 mm.