keyword=Target cooldown completed
17:00 completed cooldown LH2/LD2 targets. The Switch
took about 9 hours. They are at
LH2: 19K, 25.5 psi, fan at 10% (24Hz), HP heater at 100 w.
LD2: 22K, 21.5 psi, fan at 10% (24Hz), HP heater at 100 w.
Target operator should adjust heat load to the need of running.
The running target should have fan frquency increased to
25% for LH2 (15% for LD2).