    User name jpchen/mccormick

    Log entry time 17:13:10 on February27,2001

    Entry number 57097

    keyword=Target cooldown completed

    17:00 completed cooldown LH2/LD2 targets. The Switch
    took about 9 hours. They are at
    LH2: 19K, 25.5 psi, fan at 10% (24Hz), HP heater at 100 w.
    LD2: 22K, 21.5 psi, fan at 10% (24Hz), HP heater at 100 w.
    Target operator should adjust heat load to the need of running.
    The running target should have fan frquency increased to
    25% for LH2 (15% for LD2).