We made several passes of the Dipole mapper to measure the BdL of the arc magnets. Here is a summary of the results:
Run # Date/Time BdL (T.mm) Peak Noise (x10-3)
731 2/28-12:32 8457.61 0.6
732 2/28-18:49 8457.62 0.6
733 2/28-18:56 8457.64 0.5
734 2/28-19:05 8457.64 0.6
735 2/28-19:14 8457.66 0.5
736 2/28-19:19 8457.66 0.5
737 2/28-19:29 8457.65 0.5
738 2/28-22:00 8457.63 0.8
739 3/1 -11:52 8457.70 0.16
740 3/1 -12:08 8457.69 0.30
The Arc magnet string is very stable with measurements made over a whole day.
Avg BdL = 8457.65 +/- 0.03
This is a variation at the level of 3.5 ppm.