NEXT
User name ransome
Log entry time 23:57:54 on March 1,2001
Entry number 57338
keyword=Shift summary, swing shift.
Start shift with beam off. Beam back at 16:25
Kinematics 14
18:05 take radiator out, still LH2 target
19:05 go to dummy target
19:50 ROC 14 crashed, ended run 2328, couldn't get normal ending
19:55 go to 9 foil 12C, raster off, radiator out
20:18 stop run
Change to kinematics 14, coincidence
Left arm set to 1.949, 39.51degrees
Right set to 2.929, 25.05 degrees (Quad 2 and 3 cycled)
20:55 ethane fault (yellow light), called Jack, says it is a false alarm
21:15 begin coincidence run
22:54 MCC wants to go to pulsed beam
22:57 beam back
23:14 go to LD2, radiator out
23:55 switch to radiator in
16:25 2320 1M good run
16:40 2321 1M good run
17:01 2322 1M good run
17:21 2323 1M good run
17:41 2324 1M good run last LH2, radiator in
18:04 2325 1M good run first LH2, radiator out
18:44 2326 1M good run last LH2, radiator out
19:11 2327 .22 M good run, 15 cm empty, radiator out
19:29 2328 .5 M good run, 15 cm empty, radiator in
20:02 2329 .15M good run 9 foil 12C, radiator out, raster off
21:15 2330 .64 M good run, LH2, no radiator, coinc. 14
21:47 2331 .75 M good run, LH2, radiator in, coinc.14
22:24 2332 .26M good run, Dummy 15 cm, 6% radiator
22:41 2333 35K good run, Dummy 15 cm no radiator
22:56 2334 71K good run, Dummy 15 cm, no radiator
23:14 2335 .85 M good run LD2, no radiator,