• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name ransome

    Log entry time 23:57:54 on March 1,2001

    Entry number 57338

    keyword=Shift summary, swing shift.


    Start shift with beam off. Beam back at 16:25
    Kinematics 14
    18:05 take radiator out, still LH2 target
    19:05 go to dummy target
    19:50 ROC 14 crashed, ended run 2328, couldn't get normal ending
    19:55 go to 9 foil 12C, raster off, radiator out
    20:18 stop run
    Change to kinematics 14, coincidence
    Left arm set to 1.949, 39.51degrees
    Right set to 2.929, 25.05 degrees (Quad 2 and 3 cycled)

    20:55 ethane fault (yellow light), called Jack, says it is a false alarm
    21:15 begin coincidence run
    22:54 MCC wants to go to pulsed beam
    22:57 beam back
    23:14 go to LD2, radiator out
    23:55 switch to radiator in


    16:25 2320 1M good run
    16:40 2321 1M good run
    17:01 2322 1M good run
    17:21 2323 1M good run
    17:41 2324 1M good run last LH2, radiator in
    18:04 2325 1M good run first LH2, radiator out
    18:44 2326 1M good run last LH2, radiator out
    19:11 2327 .22 M good run, 15 cm empty, radiator out
    19:29 2328 .5 M good run, 15 cm empty, radiator in
    20:02 2329 .15M good run 9 foil 12C, radiator out, raster off
    21:15 2330 .64 M good run, LH2, no radiator, coinc. 14
    21:47 2331 .75 M good run, LH2, radiator in, coinc.14
    22:24 2332 .26M good run, Dummy 15 cm, 6% radiator
    22:41 2333 35K good run, Dummy 15 cm no radiator
    22:56 2334 71K good run, Dummy 15 cm, no radiator
    23:14 2335 .85 M good run LD2, no radiator,