Main INDEX
Monthly INDEX
PREV
NEXT
User name LeRose
Log entry time 16:02:18 on March 2,2001
Entry number 57411
keyword=Shift Summary
Start with production running on LD2 with radiator in.
Kin 13 singles
Left: P=2.929 at 25.023 deg (positive polarity)
Right:P=2.929 at 25.063 deg (negative polarity)
0800-0900 runs 2358-2361 Good beam the whole hour.
0900 accelerator configuration change (Hall B energy change)
----projected duration: 4 hours
----during access to move Krishni's detector discovered He leak in a warm
----return line near the cryotarget. Went to restricted access to repair.-
----1100 MCC says they're ready to bring back beam
----1147 work completed in the Hall (MCC informed, asked for sweep)
----1315 sweep completed
1320 gave MCC go ahead for beam
15cm LD2 target and 6% radiator inserted
1348 started run 2362 20 min
run 2363 20 min
run 2364 20 min
run 2365 20 min
run 2366 20 min
run 2367 20 min
run 2368 started at 1600