    Shift Summary

    16:00 Hall still in restricted access
    16:05 moved spectrometer angles: Left to 37.342 deg, right to 49.718 deg
    16:15 work in Hall finished, RC asked MCC to close the Hall
    17:30 start to sweep the Hall
    18:10 end of sweep
    18:30 BeO Target, 2uA, no-raster, beam tuning, centering, rough position (x=+1 mm,y=+3 mm).
    19:05 MCC called with trip in some accelerator component. Will take 30 - 45 min to fix.
    19:10 start cosmic run 2530
    20:15 beam back, setup for Harp measurement
    20:25 moved to 4He target
    20:30 adjusting beam current and coolant for 4He and 40 uA
    20:55 start prod. run, 4He, rad. out, 39 uA
    21:45 start prod. run, 4He, rad. 6%, 39 uA
    23:15 Target change to 10cm dummy
    23:35 Radiator out
    23:45 Target change to 9-foil 12C target, raster off


    2532 : check spot size, adjusted to 3 mm x 3 mm
    2533 : run with zero pedestals
    2534 : 4He, rad out, small PS3, to many trig. 3
    2535 : 4He, rad out, small PS3, to many trig. 3
    2536 : 4He, rad out

    2537 : 4He, rad 6%
    2538 : 4He, rad 6%
    2539 : 4He, rad 6%
    2540 : 4He, rad 6%

    2541 : dummy, 10cm, rad. 6%, 30 uA
    2542 : dummy, 10cm, rad. out, 30 uA
    2543 : 9-foil 12C, rad. out, no raster 30 uA