Main INDEX
Monthly INDEX
PREV
NEXT
User name S. Strauch
Log entry time 00:02:59 on March 6,2001
Entry number 57815
keyword=Swing shift summary
Shift Summary
16:00 Hall still in restricted access
16:05 moved spectrometer angles: Left to 37.342 deg, right to 49.718 deg
16:15 work in Hall finished, RC asked MCC to close the Hall
17:30 start to sweep the Hall
18:10 end of sweep
18:30 BeO Target, 2uA, no-raster, beam tuning, centering, rough position (x=+1 mm,y=+3 mm).
19:05 MCC called with trip in some accelerator component. Will take 30 - 45 min to fix.
19:10 start cosmic run 2530
20:15 beam back, setup for Harp measurement
20:25 moved to 4He target
20:30 adjusting beam current and coolant for 4He and 40 uA
20:55 start prod. run, 4He, rad. out, 39 uA
21:45 start prod. run, 4He, rad. 6%, 39 uA
23:15 Target change to 10cm dummy
23:35 Radiator out
23:45 Target change to 9-foil 12C target, raster off
2532 : check spot size, adjusted to 3 mm x 3 mm
2533 : run with zero pedestals
2534 : 4He, rad out, small PS3, to many trig. 3
2535 : 4He, rad out, small PS3, to many trig. 3
2536 : 4He, rad out
2537 : 4He, rad 6%
2538 : 4He, rad 6%
2539 : 4He, rad 6%
2540 : 4He, rad 6%
2541 : dummy, 10cm, rad. 6%, 30 uA
2542 : dummy, 10cm, rad. out, 30 uA
2543 : 9-foil 12C, rad. out, no raster 30 uA