User name LeRose
Log entry time 16:01:50 on March 7,2001
Entry number 57968
keyword=Shift Summary
Shift begins with production running 4He 6% Radiator
Left arm 2.195 GeV/c 31.982 deg
Right arm 1.866 GeV/c 38.554 deg
Run
2590 in progress at shift start. Ended at 8:13 (accelerator sending tune beam)
start/stop....run...............comments
8:26/9:18....2591
10 cm dummy 6% radiator
9:29/9:30...2592..........deadtime = 0 adjusting prescales
9:31/10:03..2593
10 cm dummy radiator out
10:06/10:44 ...2594
9-foil optics target radiator out
10:59/ 11:15.....2595
Moved left arm to 38.54 degrees changed p0 to 1.866 GeV/c. Loaded new trigger.
11:30 kcoda, reboot TS0 and TS1, restart CODA as directed by Bob Michaels (response to failure of datamon to work)
11:35 low ESR pressure alarm. K McCormick consulted. Not a problem, low pressure is 15K line which we're not using. (see halog 57949)
10 cm He with 6% radiator
11:45/ 11:51.....2596 prescales need adjusting
11:52/12:30......2597
10cm He no radiator
12:32/12:50.......2598
Move spectrometers
Left:
P0=+1.642
41.696 degrees
Right:
P0=-2.363 (this takes time!)
Q2 and Q3 were cycled.
27.572 degrees
New Trigger loaded
10 cm 4He target, radiator out
13:42/14:42......2599
14:42/15:51......2600
10cm 4He target, 6% radiator in
15:53/........2601 passed on to swing shift
Good beam all day!