    User name adaq

    Log entry time 16:16:46 on March 8, 2001

    Entry number 58050

    keyword=Beam Time Accounting
    Hall A

    3/8/2001 0800-1600
    Experiment #: e94104
    Shift Leader: Krishni Wijesooriya
    Shift Workers: Elaine Schulte, Kawtar Hafidi

    08000900100011001200130014001500Total Time
    Acceptable Beam
    in Use
    0 0 0 0 0 0 0 0 0
    Beam Available
    but Not in Use
    1 1 0.5 1 1 1 1 1 7.5
    Beam Not Available
    or Unacceptable
    0 0 0.5 0 0 0 0 0 0.5
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    0 0 0 0 0 0 0 0 0
    Planned Config-
    uration Change
    1 1 1 1 1 1 1 1 8
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: Took off beam in the earlier shift at 7.30 am to do a target swap frpm He to LH2 Spectrometers are being moved and surveyed for the next kinematic setting. Left arm at 31.98^0 and the right arm at 38.55^0. Everything ready by the end of the shift and curently sweeping the hall to lockup Spectrometer momenta are being set. to the next kinematic setting P_l=2.195 GeV/c and P_r=1.8662 GeV/c

    Data Entry by: K. Wijesdooriya