    Log entry time 00:00:14 on March 10, 2001

    Entry number 58189

    keyword=Beam Time Accounting
    Hall A

    3/9/2001 1600-2400
    Experiment #: e94104
    Shift Leader: Elaine Schulte
    Shift Workers: Ole Hansen, Salvatore Hrullani

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    0 0 0 0 0 30 1 1 2.5
    Beam Available
    but Not in Use
    0 0 0 0 0 0 0 0 0
    Beam Not Available
    or Unacceptable
    0 0 0 0 0 0 0 0 0
    Accelerator Con-
    figuration Chage
    1 1 1 1 1 30 0 0 5.5
    Experiment
    Ready
    0 0 10 1 1 1 1 1 5.16666666666667
    Planned Config-
    uration Change
    1 1 50 0 0 0 0 0 2.83333333333333
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 1 1 50 0 0 0 0 0 2.83333333333333
    Data Ac 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: 16:00 -17:00 Righ Arm dipole setting from configuration chage to 1.099 GeV/c; Beam energy change still under way... 17:00-18:00 Beam energy change is still under way. MCC projects another hour. The Right Arm dipole is still not quite set. 18:50 Both spectrometers are now successfully set 19:20 MCC begins to send pulsed beam to the hall to check the orbits 20:50 MCC begins to send CW beam to hall to check orbits 21:30 Begin doing harp scans 22:00 Begin Physics data taking at 1.875 GeV

    Data Entry by: Elaine Schulte