• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 16:03:06 on March 10, 2001

    Entry number 58276

    keyword=Beam Time Accounting
    Hall A

    3/10/2001 0800-1600
    Experiment #: e94104
    Shift Leader: Elaine Schulte
    Shift Workers: Elaine Schulte , Roy Holt

    08000900100011001200130014001500Total Time
    Acceptable Beam
    in Use
    15 0 0 10 0 0 40 50 1.91666666666667
    Beam Available
    but Not in Use
    0 0 5 5 0 0 0 0 0.166666666666667
    Beam Not Available
    or Unacceptable
    45 1 55 0 0 0 0 10 2.83333333333333
    Accelerator Con-
    figuration Chage
    0 0 0 45 1 1 20 0 3.08333333333333
    Experiment
    Ready
    1 1 55 55 0 15 1 1 6.08333333333333
    Planned Config-
    uration Change
    0 0 0 0 1 45 0 0 1.75
    Unplanned
    Experiment Down
    0 0 5 5 0 0 0 00.166666666666667
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 1 45 0 0 1.75
    HRSh 0 0 5 5 1 45 0 0 1.91666666666667
    Data Ac 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: 08:15 MCC calls to report a magnet problem which requires an access to the south linac 11:15 MCC takes back beam for the beam energy change. Setting up for the sing12 14:20 Beam Delivery 15:50 MCC takes beam to check Hall C orbits

    Data Entry by: Elaine Schulte