    08:20 Change to LD2 target--Running commences with 30 uA beam No radiator

    10:20 Inserted radiator to 6%. Begin taking radiator in data at 30 uA.

    11:50 During the shift checklist it was noted that the left arm Q2 nitrogen level is 14%--which appears to be OK accroding to previous shift checklists.

    13:58 MCc calls to inform us that Hall C is warming up they're cryotarget and that we may experience some cryo fluctuations.

    14:00 Begin setup for sing10
    Left p0=2.799; theta=18.57 floor mark:19.0 vernier -43.5
    Right p0=-2.799; theta=18.57 floor mark:18.5 vernier -22.0

    Cycled Q2 and Q3 on Right and left arms

    14:10 Javier Gomez is called because the magnet slow control panels will not come up from the MEDM screen.--This turned out to be a feature of MEDM on Linux

    Make sure the left mouse button is always depressed when selecting a screen from the Hall A controls.

    14:57 Magnet angles and Left momentum are successfully set. Still waiting on the Right dipole.

    15:20 Right Arm Dipole successfully set.

    15:22 Ask MCC to reduce current to 10 uA because of 91% dead time!!!!
    Prescales on singles have been set to 6 (ps1 and ps3) to keep the dead time below
    25%

    16:00 Successfully taking data at singles 10 setup. Approximately 1/2 hour of the 1.5 hours of data requested of LD2 6% radiator completed.