Main INDEX
Monthly INDEX
PREV
NEXT
User name fissum
Log entry time 18:24:00 on March13,2001
Entry number 58701
keyword=accepted the beam
MCC has done their best to solve the problem with
the beam geometry. We have accepted the beam.
The present steering is:
H04A X 1.378 Y 0.578
H04B X -0.22 Y -0.027
These numbers are not in spec wrt the runplan, but
will have to do. Start the run at 18.20.