    User name fissum

    Log entry time 18:24:00 on March13,2001

    Entry number 58701

    keyword=accepted the beam

    MCC has done their best to solve the problem with
    the beam geometry. We have accepted the beam.
    The present steering is:

    H04A X 1.378 Y 0.578
    H04B X -0.22 Y -0.027

    These numbers are not in spec wrt the runplan, but
    will have to do. Start the run at 18.20.