1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 60 | 25 | 40 | 55 | 55 | 45 | 50 | 60 | 6.5 |
Beam Available but Not in Use | 0 | 0 | 0 | 0 | 0 | 15 | 0 | 0 | 0.25 |
Beam Not Available or Unacceptable | 0 | 35 | 20 | 5 | 5 | 0 | 10 | 0 | 1.25 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 60 | 60 | 60 | 60 | 60 | 45 | 60 | 60 | 7.75 |
Planned Config- uration Change | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 0 | 15 | 0 | 0 | 0.25 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 15 | 0 | 0 | 0.25 |
HRSe | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSh | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Data Ac | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Comments: hour 1 - completed the 9-foil target scan and reinserted the 15 cm lH2 target; hour 2 - took some data before a problem with the beam at the dump was recognized: steering; hour 3 - steering, then begin production; hour 4 - 90 uA production; hour 5 - 90 uA production; hour 6 - 40 uA production; hour 7 - 40 uA production; hour 8 - 90 uA production.
Data Entry by: Kevin Fissum