    keyword=beam gone, then back. BeO check

    09:30 MCC took the beam away to do some tuning for Hall B.
    That ended run 2916. Then, 10:00 we put the BeO target in place
    for a visual spot check, 10 microA, raster on.
    The raster size (measured at BPM 4B) is 2 mm square,
    so we judge from the BeO screen that it is 2 mm high in
    the picture (presumably this means 2 mm low since the
    the mirror inverts) and 0.5 mm to the left in the picture.
    Run 2917 during this check. Now back to production.