User name R. Michaels
Log entry time 10:09:52 on March14,2001
Entry number 58760
keyword=beam gone, then back. BeO check
09:30 MCC took the beam away to do some tuning for Hall B.
That ended run 2916. Then, 10:00 we put the BeO target in place
for a visual spot check, 10 microA, raster on.
The raster size (measured at BPM 4B) is 2 mm square,
so we judge from the BeO screen that it is 2 mm high in
the picture (presumably this means 2 mm low since the
the mirror inverts) and 0.5 mm to the left in the picture.
Run 2917 during this check. Now back to production.