User name C. C. Chang
Log entry time 23:58:40 on March23,2001
Entry number 59202
keyword=Shift Summary
Run # Start Stop #Events Comments
3061 15:27 16:29 1M
3062 16:36 16:47 163K End run to make Hall A access
3063 21:13 Runs 3063 through 3067 are garbage
3068 22:07 23:01 1M Good run
3069 23:02 23:58 1M
16:29 MCC called to inform us to stop the beam in 5 minutes for Hall A
controlled access to work on RICH.
16:50 Beam off. Make Hall A controlled access to work on RICH.
18:30 Left VDC HV (top and bottom) tripped off. This happened while
people were working in left arm hut area on RICH. Reset both left
arm VDC HVs.
19:25 Both VDC HV on left arm tripped again. Reset them.
20:55 Power permit.
21:08 MCC called to give us beam.
21:10 Beam is back.
21:13 Runs 3063 through 3067 are garbage runs because left VDC thresholds
were reset to zero due to HV tripped earlier. As a result, all wires were
read causing large data stream.