    Run# Start Stop #Events Comments
    3087 15:01 15:55 1M
    3088 15:55 16:55 1M
    3089 16:55 18:13 1M
    3090 19:25 19:30 Carbon, optics run, no raster
    3091 19:34 19:44 205K Dummy run, no raster
    3092 19:48 19:56 528K 9-foils carbon optics run, no raster
    3093 20:01 20:12 53K Short run to chech beam sopt size
    and position. It looks good.
    3094 20:14 21:43 1M First completed good run for kin #20
    3095 21:44 22:31 ~521K Run ended due to ROC14 problem
    3096 22:38 23:27 544K Run ended due to beam problem.


    18:20 Run kin #19 run. Switch to kin #20 kinematics. Had trouble moving
    angles for both arms. Made a hall access to reset both spectrometer
    angular movements.
    20:31 ROC14 hanged. Reboot ROC14.
    23:29 MCC called to inform us that they have power supply problem. Beam
    will be down for about 15 minutes. At the same time we also have
    target alarm; the target temperature drops down to 15.5 K.
    23:42 MCC called again saying that the power is not responding. There is no
    estimate as to when beam will be be back.