Main INDEX
Monthly INDEX
PREV
NEXT
User name Markowitz
Log entry time 10:26:08 on March27,2001
Entry number 59398
keyword=HV GUI for Le|Croy
The new HV GUI for the detector systems LeCroy HV crates has been down about 12-14 hours. It seems to be the IOC (probably iocha22). Karen White gave me the name of the responsible individual:
Slominski, Christopher 6030 820-9576+ 85A 85/103 ACC cjs@jlab.org
who is now going to reboot the ioc. Since we have been able to use the port server, we did not feel this was an emergency and so waited until the present maintenance period to get this fixed (in case the reboot trips off the HV).
Her group will also get us a list of what IOC controls what hardware -- that would be a good thing to post next to the controls terminal. [Such a list does not presently exist, Karen says. New ioc's need to be included.]