• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name dohrmann

    Log entry time 04:16:12 on March28,2001

    Entry number 59443

    keyword=fixed TS1 and A2 ch1 problems during access

    Lingyan power cycled the TS1 and also checked the connection of the A2 ch1
    base. Now both problems seems solved

    FD